Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ
Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option”
For more information please see below link:
tags:
1200 MW Firm Adoption of Tariff CERC Dispatchable Power ENERGY STORAGE SYSTEM GREENSHOE OPTION ISTS-CONNECTED RE power projects REGULATIONS


