Petition for adoption of tariff for Supply of 1200 MW from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ
Petition for adoption of tariff for Supply of 1200 MW from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option”
For more information please see below link:
tags:
1200 MW Adoption of Tariff CERC ENERGY STORAGE SYSTEM GREENSHOE OPTION ISTS-CONNECTED RE power projects REGULATIONS


