Summary:

## **1. Purpose of the Petition**

POWERGRID Barmer I Transmission Limited (BITL) filed this petition under:

* **Section 14** of the Electricity Act, 2003
* **CERC Transmission Licence Regulations, 2024**

seeking the grant of a **separate Transmission Licence under the Regulated Tariff Mechanism (RTM)**.

### **Transmission Asset Covered:**

**Implementation of 1 no. of 220 kV line bay**
for interconnecting:
➡️ **M/s Anboto Solar Private Limited’s 300 MW (250 MW + 50 MW) Renewable Energy Project**
to
➡️ **765/400/220 kV Barmer-I Pooling Substation (PS)**

This is a connectivity-linked, system-strengthening requirement for renewable evacuation.

## **2. Petitioner’s Submission (BITL)**

BITL’s representative submitted that:

### ✔ All regulatory compliance requirements have been fulfilled.

### ✔ CTUIL has provided recommendation under **Section 15(4)** of the Act.

* CTUIL’s recommendation supports the grant of a transmission licence to BITL.
* Compliance is fully aligned with **Transmission Licence Regulations, 2024**.

### ✔ The project falls entirely under the **Regulated Tariff Mechanism (RTM)**.

## **3. CTUIL’s Position**

* CTUIL was represented (Ms. Muskan Agarwal).
* CTUIL has already **recommended the granting of the licence**, confirming system need and regulatory compliance.

## **4. Commission’s Proceedings and Directions**

After hearing the petitioner and noting CTUIL’s recommendation:

### **CERC Reserved the Matter for Order.**

No further submissions were demanded at the hearing.
The petition is now pending a **final order** from the Commission.

## **5. Business & Regulatory Implications**

### **For BITL (POWERGRID Subsidiary)**

* A favourable order will allow BITL to develop and operate the dedicated bay under a **Regulated Tariff Mechanism**, ensuring cost recovery via approved tariff.

### **For Anboto Solar Private Limited**

* This bay is essential for the **grid interconnection of 300 MW RE capacity**.
* Timely approval avoids delay in commissioning and evacuation of renewable power.

### **For CTUIL & Grid Ecosystem**

* The bay strengthens renewable evacuation infrastructure at the Barmer-I node.
* Enhances grid reliability with a standardised RTM framework.

### **For CERC**

* The decision supports structured RE evacuation through small RTM-based transmission assets.