Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with Energy Storage System by Ministry of Power, Government of India – EQ
0
0
Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with Energy Storage System by Ministry of Power, Government of India
For more information please see below link:
Related posts:
- Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/1200 MWh Energy Storage System – EQ
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Firm & Despatchable Power from ISTS connected Renewable Energy Power Projects – EQ
- Petition for Adoption of tariff for 2100 MW Power from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
tags:
1200 MW Adoption of Tariff CERC ENERGY STORAGE SYSTEM Government of India ISTS Grid connected Ministry of Power REGULATIONS SOLAR POWER PROJECTS


