Kalpataru Projects International Strengthens Order Book with ₹2,720 Crore Global Contracts – EQ

In Short : Kalpataru Projects International has secured fresh orders worth ₹2,720 crore across various business segments. The contracts include transmission and distribution projects in India and overseas, along with civil and construction works. These new wins further strengthen the company’s order book, showcasing its execution capabilities and reinforcing its position as a leading player […]

Extension of Validity of the panel of CCIES – EQ

Summary: — ## 📌 Background * **Issuing Authority:** Ministry of Power, Government of India * **Date:** 8th September 2025 * **Subject:** Extension of validity of Conciliation Committees of Independent Experts (CCIEs). — ## ⚡ Key Points 1. **Conciliation Mechanism:** * Introduced via OM dated **29.12.2021**, with amendments on **25.04.2022** (coal mining expert) and subsequent empanelments. […]

India Targets Swadeshi Solar Cells by 2028; Moving Towards Indigenous Wafers and Ingots: Union Minister Pralhad Joshi – EQ

In Short : Union Minister Pralhad Joshi announced India’s target to achieve complete indigenization of solar cells by 2028, including wafers and ingots. The initiative aims to reduce import dependence, strengthen domestic manufacturing, and boost self-reliance in renewable energy. By promoting local production, India seeks to build a robust solar ecosystem and accelerate its transition […]

Union Minister Pralhad Joshi inaugurates 1st Green Hydrogen R&D Conference; launches ₹100 crore Call for Proposals for Start-ups – EQ

In Short : Union Minister Pralhad Joshi inaugurated the first Green Hydrogen R&D Conference, highlighting innovation’s role in India’s clean energy transition. During the event, he launched a ₹100 crore Call for Proposals to support start-ups working on green hydrogen technologies. The initiative aims to accelerate research, strengthen India’s hydrogen ecosystem, and drive sustainable solutions […]

Petition for Truing up and determination of transmission tariff for Transmission System associated with Kishenpur-Moga transmission system in the Northern Region – EQ

Summary: — #### **1. Case Overview** * **Petitioner:** **Power Grid Corporation of India Limited (PGCIL)** * **Subject:** The petition is a comprehensive request for tariff adjustments for specific transmission assets in the Northern Region across multiple control periods. It combines two petitions: 1. **Petition No. 482/TT/2019:** For assets related to the **Kishenpur-Moga transmission system**. 2. […]

Petition for truing up and determination of tariff for respect of Dulhasti Power Station – EQ

Summary: — #### **1. Case Overview** * **Petitioner:** **NHPC Limited** (National Hydroelectric Power Corporation) * **Subject:** The petition seeks: 1. **Truing Up** of the tariff for the **Dulhasti Power Station** for the past control period (**2019-24**). 2. **Determination** of the tariff for the upcoming control period (**2024-29**). * **”Truing Up”** is a regulatory process where […]

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for Ratle Kiru Power Transmission Ltd – EQ

Summary: — #### **1. Background & Petitioner** * **Petitioner:** **Ratle Kiru Power Transmission Limited (RKPTL)** * **Purpose:** The petition sought the grant of an **inter-state transmission license** under the Electricity Act, 2003. * **Project:** To implement the **”Transmission scheme for evacuation of power from Ratle HEP (850 MW) & Kiru HEP (624 MW): Part-A”** on […]

SJVN Ltd issue Tender for setting up of 1.6 MW Grid connected RTS PV Power Projects in the Eastern Region under RESCO MODE PMSGM – EQ

Summary: — #### **1. Project Overview** * **Scheme:** Part of the **”PM Surya Ghar: Muft Bijli Yojana”** for government buildings. * **Mode:** **RESCO/PPA Model**. The developer owns, operates, and maintains the plant and sells power to the government consumer. * **Scope:** Setting up of **cumulative 1555 KW** of grid-connected rooftop solar PV projects **without battery […]

MECL issue Tender for Allied HT Electrical Works for Proposed Solar Power Installations at CHQ Building and Khanij Niketan, MECL Nagpur – EQ

Summary: ### **Detailed Summary: MECL Tender for Allied HT Electrical Works** **Document:** Notice Inviting Tender (NIT) – Short Term **Issued by:** Mineral Exploration and Consultancy Limited (MECL), a Government of India Enterprise. **Tender Notice No.:** 169/MECL/RME/HTWORKS/25-26 **Date:** September 4, 2025 — #### **1. Tender Overview** * **Work Description:** **Allied HT Electrical Works** for proposed solar […]

DG Sashastra Seema Bal issue Tender for Repairing and Up-gradation of 06 Nos Off-grid Solar Power Plant at BOPs under 57th Bn SSB, Sitarganj – EQ

Summary: ### **Detailed Summary: SSB Tender for Repair & Up-gradation of Solar Power Plants** **Document:** Notice Inviting e-Tender (NIT) – Two Bid System (Technical & Financial) **Issued by:** Sashastra Seema Bal (SSB), Government of India. Tender Inviting Authority: Executive Engineer, SHQ, SSB, Pilibhit (UP). **NIT No.:** EE/SHQ/PBT/2025-26/13 (3rd Call) **Date:** Appears to be issued around […]