1. Home
  2. Tag "200 MW connectivity"

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations to Serentica Renewables India 4 Private Limited of 200 MW connectivity – EQ

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations to Serentica Renewables India 4 Private Limited of 200 MW connectivity For more information please see below link:

Petition of the GERC (Conduct of Business) Regulations with Gujarat Renewable Energy Policy, 2023 – EQ