1. Home
  2. Tag "Hydroelectric Power Station-III"

In the matter of: Revision of tariff of Teesta Low Dam Hydroelectric Power Station-III (132 MW)

  In the matter of: Revision of tariff of Teesta Low Dam Hydroelectric Power Station-III (132 MW) for the period from 1.4.2013 to 31.3.2014-Truing-up of tariff determined by Commission‟s order dated 22.1.2015 in Petition No. 115/GT/2013 For more information please see below link:

Workshop/discussion on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2021 – EQ Mag Pro