1. Home
  2. Tag "Third Amendment"

In the Matter of TGERC (Electricity Supply Code) Draft (Third Amendment) Regulation, 2026 – EQ

Summary: — ### Background / Reason for Amendment – **TGSPDCL** (Telangana State Power Distribution Company Limited) submitted proposals to amend **Clause 4.7.3** of the Principal Regulation. – The objective is to remove **disparity** between: – Interest rate charged to consumers on **outstanding bills when instalments are granted** (as per Tariff Order), and – Interest rate […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Petition of the CERC (Connectivity and General Network Access to the interstate Transmission System) (Third Amendment) Regulations of Hybrid Power Project – EQ

Summary: — ## Key Business Facts | Parameter | Detail | |———–|——–| | **Petitioner** | VEH Jayin Renewables Private Limited (VJRPL) | | **Respondent** | Central Transmission Utility of India Limited (CTUIL) | | **Total Project Capacity** | 151.8 MW (Hybrid Project) | | **Additional Capacity Sought** | 45 MW (Solar) | | **Connectivity Point** […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

RERC (Electricity Supply Code and Connected Matters) (Third Amendment), Regulations, 2026 – EQ

Summary: — ### Key Amendments #### 1. New Provision: Dual Source Supply for HT/EHT Consumers (Regulation 6.14) A new sub-regulation **6.14** is inserted, which allows **HT/EHT consumers** to avail electricity supply from **two sources**, either: – **Simultaneous use** of both sources, or – One as a **standby source** **Conditions**: – Subject to **technical feasibility** and […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ

Summary: —- **Key Parties:** – **Petitioner:** Indosol Solar Private Limited (ISPL), a solar power generation company. – **Respondent:** Central Transmission Utility of India Limited (CTUIL), the central transmission utility. **Procedural Status & Key Developments:** 1. **Compliance Filed:** The Petitioner’s counsel informed the Commission that ISPL has complied with previous directives. A compliance affidavit dated February […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Draft – KSERC (Terms and Conditions for Determination of Tariff) (Third Amendment) Regulations, 2025 – EQ

Summary: — ### **1. Regulatory Context** * Issued by the Kerala State Electricity Regulatory Commission (KSERC) under Sections 61 and 181 of the Electricity Act, 2003. * Proposed as the **Third Amendment** to the Tariff Regulations, 2021, following earlier amendments in 2023 and 2024. * Applicable for the ongoing **Control Period 2022–2027**. * Draft published […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

In the matter of the RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Third Amendment) Regulations, 2025 – EQ

Summary: — ## **1. Introduction of Updated Definition: Distributed Renewable Energy System (DRE)** The Order introduces a comprehensive new definition of **DRE Systems**, applicable to domestic and non-domestic consumers. These systems use renewable sources (solar, hydro, biogas, biomass, geothermal, wind) and must be located on the consumer’s premises or group/shared locations. They may operate individually […]

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Drat GERC (Terms & CondiGons for Green Energy Open Access) (Third Amendment) RegulaGons, 2025 – EQ

Summary: — ## 📌 Context * **Issuing Body:** Gujarat Electricity Regulatory Commission (GERC) * **Document:** Draft (Third Amendment) to the *GERC Terms & Conditions for Green Energy Open Access Regulations, 2024*. * **Date:** 30th August 2025 * **Jurisdiction:** Entire state of Gujarat — ## ⚡ Key Amendments 1. **Regulation 1(4) – Banking Charges Applicability** * […]

Green Economy to Create New Avenues of ‘Green Jobs’ and ‘Green Entrepreneurship’, Youth to Play Key Role in India’s Sustainability-Driven Growth: Dr. Jitendra Singh – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 For more information please see below link:

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) and (Second Amendment) and (Third Amendment) Regulations – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) and (Second Amendment) and (Third Amendment) Regulations For more information please see below link:

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ