India January 19, 2021 Anand Gupta 0 Waiver of Inter-State Transmission charges and losses on transmission of electricity generated from solar and wind sources of energy. 0 0 0 00 0 0 more now viewing Waiver of Inter-State Transmission charges and losses on transmission of electricity generated from solar and wind sources of energy. January 19, 2021 Anand Gupta now playing Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time - EQ January 19, 2021 Anand Gupta now playing Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region - EQ January 19, 2021 Anand Gupta now playing Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ - EQ January 19, 2021 Anand Gupta now playing Gujarat Green Hydrogen Project Policy 2025 - EQ January 19, 2021 Anand Gupta now playing Final Renewable Energy Gujarat Policy 2025 - EQ January 19, 2021 Anand Gupta now playing MES issue Tender for Provn of Roof Top Solar Plants at Bathinda, Faridkot, Lalgarh Jattan, Abohar and Fazilka - EQ January 19, 2021 Anand Gupta now playing TIFR issue Tender for DSITC of On-grid rooftop solar power plant at the main building terrace - EQ January 19, 2021 Anand Gupta now playing Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah - EQ January 19, 2021 Anand Gupta now playing No Final Decision Taken on Power Sector Privatisation, Says UP Energy Minister - EQ January 19, 2021 Anand Gupta now playing Lower, Fixed Transaction Fee Structure for Power Exchanges Under Consideration - EQ January 19, 2021 Anand Gupta Waiver of Inter-State Transmission charges and losses on transmission of electricity generated from solar and wind sources of energy. For More Information Click on below Link : Related posts: Tadepalli: Special action plan on anvil to promote solar, wind power projects All you need to know about areas for establishing solar, wind plants in Egypt COVID-19: Second wave could delay 4 GW of solar, wind projects under 3-4 months extension Global Electricity Review 2021 tags: electricity SOLAR Wind 0 00 0 0 previous ADB, Tata Capital Sign Deal to Support Small and Medium-Sized Businesses in India next NTPC Group records its highest-ever power generation on Jan 18 Anand Gupta Editor - EQ Int'l Media Network Related Posts Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah – EQ December 25, 2025 Anand Gupta 0 No Final Decision Taken on Power Sector Privatisation, Says UP Energy Minister – EQ December 25, 2025 Anand Gupta 0 Lower, Fixed Transaction Fee Structure for Power Exchanges Under Consideration – EQ December 25, 2025 Anand Gupta 0