## ⚖️ **DETAILED SUMMARY – CERC Daily Order**

### 📄 Document Type: Record of Proceedings (RoP)

### 📅 Date of Hearing: 29 July 2025

### 🏛️ Issuing Authority: Central Electricity Regulatory Commission (CERC), New Delhi

### 📘 Case Reference:

* **Petition No.** 452/MP/2025
* **IA No.** 38/2025

### 📌 **Case Overview**

#### 📖 **Nature of Petition:**

Filed under:

* **Section 79** of the Electricity Act, 2003
* **Regulations 41 & 42** of the **CERC (Connectivity and General Network Access to ISTS) Regulations, 2022**
* **Regulations 65 to 69** of the **CERC (Conduct of Business) Regulations, 2023**
* Other relevant provisions of applicable law

#### ⚠️ **Objective**:

To seek **extension of time** for compliance with **Commission’s directions issued in Order dated 25.11.2024** in Petition No. 326/MP/2024 regarding:

* **Commissioning of 300 MW Solar Power Project** at **Nokhadhaya, Kolya, Bikaner, Rajasthan**

### 👥 **Parties Involved**

#### **Petitioner**:

* **ACME Solar Holdings Limited and Another**
* **Represented by Advocates**:

* Shri Aniket Prasoon
* Ms. Praiksha Chaturvedi
* Ms. Prithu Chawla
* Ms. Rashmi Vaish

#### **Respondents**:

* **Central Transmission Utility of India Limited (CTUIL)** and others
* **Represented by Advocates**:

* Shri Shubham Arya
* Shri Rishabh Saxena
* Ms. Shirin Gupta
* **CTUIL Representative**:

* Shri Swapnil Verma

### 🧾 **Proceedings Summary**

1. **Scheduled Hearing** on 29 July 2025 could **not be conducted** due to **lack of time**.
2. The Commission noted that the **interim directions** issued during the **24 April 2025 hearing** will **remain in effect** until the next hearing.
3. The matter is now **adjourned** and will be **heard next on 9 September 2025**.

### 🖋️ **Signatory**

**T.D. Pant**
Joint Chief (Law), CERC