Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) and (Conduct of Business) Regulations of the 300 MW SPP located at Bikaner, Rajasthan – EQ
Summary:
—
##
**DETAILED SUMMARY – CERC Daily Order**
### Document Type: Record of Proceedings (RoP)
### Date of Hearing: 29 July 2025
### Issuing Authority: Central Electricity Regulatory Commission (CERC), New Delhi
### Case Reference:
* **Petition No.** 452/MP/2025
* **IA No.** 38/2025
—
###
**Case Overview**
#### **Nature of Petition:**
Filed under:
* **Section 79** of the Electricity Act, 2003
* **Regulations 41 & 42** of the **CERC (Connectivity and General Network Access to ISTS) Regulations, 2022**
* **Regulations 65 to 69** of the **CERC (Conduct of Business) Regulations, 2023**
* Other relevant provisions of applicable law
#### **Objective**:
To seek **extension of time** for compliance with **Commission’s directions issued in Order dated 25.11.2024** in Petition No. 326/MP/2024 regarding:
* **Commissioning of 300 MW Solar Power Project** at **Nokhadhaya, Kolya, Bikaner, Rajasthan**
—
###
**Parties Involved**
#### **Petitioner**:
* **ACME Solar Holdings Limited and Another**
* **Represented by Advocates**:
* Shri Aniket Prasoon
* Ms. Praiksha Chaturvedi
* Ms. Prithu Chawla
* Ms. Rashmi Vaish
#### **Respondents**:
* **Central Transmission Utility of India Limited (CTUIL)** and others
* **Represented by Advocates**:
* Shri Shubham Arya
* Shri Rishabh Saxena
* Ms. Shirin Gupta
* **CTUIL Representative**:
* Shri Swapnil Verma
—
###
**Proceedings Summary**
1. **Scheduled Hearing** on 29 July 2025 could **not be conducted** due to **lack of time**.
2. The Commission noted that the **interim directions** issued during the **24 April 2025 hearing** will **remain in effect** until the next hearing.
3. The matter is now **adjourned** and will be **heard next on 9 September 2025**.
—
###
**Signatory**
**T.D. Pant**
Joint Chief (Law), CERC
—