Petition for Adoption of tariff for 100 MW Solar PV Power Project (Tranche- VIII) connected to ISTS of the Government of India – EQ
Summary:
—
## **Case Summary – SECI vs. AMP Energy Utility Pvt. Ltd. & Ors.**
**Forum:** Central Electricity Regulatory Commission (CERC), New Delhi
**Petition No.:** 723/AT/2025
**Date of Hearing:** 12 August 2025
**Coram:**
* Jishnu Barua, Chairperson
* Ramesh Babu V., Member
* Harish Dudani, Member
* Ravinder Singh Dhillon, Member
—
### **1. Case Background**
* **Petitioner:** Solar Energy Corporation of India Limited (SECI)
* **Respondents:** AMP Energy Utility Pvt. Ltd. & Ors.
* **Nature of Petition:** Under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** discovered for a **100 MW Solar PV Power Project (Tranche-VIII)** connected to the **Inter-State Transmission System (ISTS)**, selected via competitive bidding.
—
### **2. Submissions**
* **SECI:** Petition filed for tariff adoption of 100 MW solar project, discovered through transparent competitive bidding process as per MNRE guidelines.
* **Respondents (AMP Energy):** No objection raised to tariff adoption.
—
### **3. Commission’s Observations & Directions**
* Petition is **admitted**.
* **Notice issued** to Respondents.
* **Timelines set:**
* Respondents to file reply within **2 weeks** (copy to SECI).
* SECI may file rejoinder within **2 weeks** thereafter.
* Petition will be **listed for hearing on 19.09.2025**.
—
### **4. Outcome**
* **Type of Order:** Procedural (Record of Proceedings).
* **Effect:** Petition admitted, consultation process initiated.
* Final adoption of tariff **pending**, subject to completion of reply/rejoinder process and next hearing.
—
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff for the ISTS Grid connected Solar Photo Voltaic Projects of 2400 MW with “Greenshoe Option” – EQ
- Petition for Adoption of tariff for 1200 MW Solar PV Power Projects connected to the interState Transmission System amended from time to time – EQ
- Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects with ‘Green-Shoe Option” under by Ministry of Power, Govt. of India – EQ
- Petition for Adoption of tariff for 2100 MW Firm & Despatchable Power from ISTS connected RE Power Projects coupled with Energy Storage System – EQ