1. Home
  2. Policy
  3. &
  4. Regulation
  5. Petition for approval of prefixed levelized tariff for purchase of power from Decentralize Ground / Stilt Mounted Grid Connected Solar / other RE based power plants – EQ
Petition for approval of prefixed levelized tariff for purchase of power from Decentralize Ground / Stilt Mounted Grid Connected Solar / other RE based power plants – EQ

Petition for approval of prefixed levelized tariff for purchase of power from Decentralize Ground / Stilt Mounted Grid Connected Solar / other RE based power plants – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network