
Petition of the GERC of grid connectivity and commissioning of 7.8 MW solar plant for captive use due to occurrence of uncontrollable events – EQ
0
0
Petition of the GERC of grid connectivity and commissioning of 7.8 MW solar plant for captive use due to occurrence of uncontrollable events
For more information please see below link:
Related posts:
- Petition of GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of unforeseen and uncontrollable events – EQ
- Petition of the GERC (Conduct of Business) Regulations for commissioning the entire evacuation infrastructure due to occurrence of uncontrollable events – EQ
- Petition of the Electricity Act of the GERC (Conduct of Business) Regulations in commissioning of generation capacity – EQ
- Petition of the GERC (Conduct of Business) Regulations for commissioning of the 3.9 MW AC Solar Power Plant project – EQ