RFS for 35 MW Solar PV projects in Puducherry: extension of bid submission deadlines
37
0
With respect to the RfS document (RfS No. SECI/JNNSM/P-2/B-3/RfS/PD/042016) for Selection of Grid connected Solar PV Projects of 35 MW in Puducherry (Non Solar Park), the deadline for bid submission has been extended upto 28.06.2016.
Tender Search Code (TSC) for the RfS: SECI-2016-TN000015
Related posts:
- Harnessing of solar energy on rooftop of Railway building by implementation of 1 MWp roof top solar photo voltaic system at Central Railway Loco Workshop, Parel
- Tender For Design, Supply, Installation And Commissioning Of Solar Photovoltaic Power Plants – Sarguja
- Design, engineering, manufacture, inspection, supply, transportation, storage, insurance, civil work, erection, testing, commissioning and O and M of the grid connected rooftop 40kWp Solar PV plants
- 10 KWp On-Grid Roof Mounted Captive Solar Power Project at Indian Oil Aviation Fuel Station , Patna , Bihar