SUPPLY , INSTALLATION AND 5 YEARS CAMC FOR SOLAR POWER PLANT AT MUMBAI REFINERY
72
0
SUPPLY , INSTALLATION AND 5 YEARS CAMC FOR SOLAR POWER PLANT AT MUMBAI REFINERY
For more information please see below link:
Related posts:
- Supply, installation, testing, commissioning and maintaining roof top grid interactive PV solar power plant using multi crystalline PV modules
- Supply, Installation and Commissioning of Solar High Mast Lightingarrangement along Coal Desptch Route
- Design, Manufacture, Supply, Installation and Commissioning of Different Capacity Roof Top Solar PV Power Projects under Net Metering Policy in Aligarh City- (Smart City Mission)
- Selection of Bidders for Design, Engineering, Manufacturing, Supply, Installation, Testing, Commissioning, Operation and Maintenance of Cumulative 5MWp Grid Connected Rooftop Solar Photovoltaic Power Generation Plant on the basis of RESCO mode. Rate