Shri K. Shanmugha Sundaram has taken charge as Director (Projects), NTPC on 1st December, 2023. Shri K. Shanmugha Sundaram is a 1988 batch Electronics and Communication Engineering graduate from Govt. College of Technology, Coimbatore with PGDM from MDI Gurgaon in the area of Strategy & Finance. Prior to joining as Director (Projects), NTPC Limited, he […]
Petition for determination of tariff on installation of various Emission Control Systems at National Capital Thermal Power Station (NCTPS), Dadri Stage-I (840MW) For more information please see below link:
Petition for truing up of tariff for the period 2014-19 and determination of tariff for the period 2019-24 in respect of National Capital Thermal Power Station, Stage-II (980 MW). NTPC Limited For more information please see below link:
NTPC has signed an MoA with Engineers India Limited (EIL) wherein NETRA (the R&D centre of NTPC Ltd.) can take up collaborative projects in the domain of Carbon Capture Utilization & Storage (CCUS), Green Fuel, Green Chemicals including Green Hydrogen, Green Ammonia etc, Green Fertilizers, Bio-Fuels, Decarbonization, Waste Handling, Water, Ash etc. leading to clean […]
India’s largest integrated energy conglomerate, NTPC Limited, has been recognized as one of the “World’s Best Employers 2023” in the Forbes World’s Best Employers list 2023 released on 10th Oct 2023. It ranked 261st out of top 700 companies in the World ranking and is the only Indian PSU to figure in the list. This […]
Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid For more information please see below link:
Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024. NTPC Ltd. For more information please see below link:
Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited For more information please see below link: