1. Home
  2. Featured
  3. Interaction with stakeholders on the proposed pilot project of setting up of 1000 MWh Standalone Battery Energy Storage System (BESS) under competitive bidding – EQ Mag Pro
Interaction with stakeholders on the proposed pilot project of setting up of 1000 MWh Standalone Battery Energy Storage System (BESS) under competitive bidding – EQ Mag Pro

Interaction with stakeholders on the proposed pilot project of setting up of 1000 MWh Standalone Battery Energy Storage System (BESS) under competitive bidding – EQ Mag Pro

0
0

This has reference to the Expression of Interest (EOI) issued by Solar Energy Corporation of India Limited (SECI) from prospective bidders for setting up of 1000 MWh Standalone Battery Energy Storage System (BESS) in India under Global Competitive Bidding on 14-10-2021. This also included the draft guidelines and draft RfS documents.

In this connection, a meeting has been scheduled under the Chairmanship of Hon’ble Minister for Power and NRE, Government of India on 23-11-2021 (Tuesday) at 12:30 PM through Video Conferencing to interact with stakeholders on the bidding document of proposed Pilot Project of 1000 MWh Standalone Battery Energy Storage System (BESS).

The link for joining the meeting will be shared separately. The interested stakeholders who wish to participate in the meeting, may intimate the names and email IDs of respective participants, to debranjan.chattopadhyay@nic.in and jayansh.gaur@seci.co.in. The number of participants from each organization may be limited to 2 (two) in view of limitations in the Video Conferencing platform.

Anand Gupta Editor - EQ Int'l Media Network