1. Home
  2. Policy & Regulation
  3. Petition for the adoption of tariff for 600 MW Wind Power Projects (Tranche-XIII) connected to the Inter-State Transmission System and selected through competitive bidding process – EQ
Petition for the adoption of tariff for 600 MW Wind Power Projects (Tranche-XIII) connected to the Inter-State Transmission System and selected through competitive bidding process – EQ

Petition for the adoption of tariff for 600 MW Wind Power Projects (Tranche-XIII) connected to the Inter-State Transmission System and selected through competitive bidding process – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network